導航:全球石油化工網 >> 資訊頻道 >> 技術裝備

哈里伯頓公司的新式海上油氣工作船(英)

[加入收藏][字號: ] [時間:2009-02-05 Halliburton 關注度:0]
摘要:簡介:哈里伯頓公司推出新型海上工作船Stim Star Borneo,它是為在東南亞進行作業而設計的。它能進行各項增產措施,并能使用連續管進行修井作業。 Operators in Southeast Asia can now mo...
簡介:哈里伯頓公司推出新型海上工作船Stim Star Borneo,它是為在東南亞進行作業而設計的。它能進行各項增產措施,并能使用連續管進行修井作業。

Operators in Southeast Asia can now more readily implement Halliburton advanced stimulation and well intervention technologies. The new Stim Star Borneo vessel is a self propelled barge designed to work in the offshore oil and gas fields with the additional capability of servicing
wells in the rivers and deltas in Indonesia. 

The vessel is fully equipped to handle all phases of production stimulation including acidizing, acid fracturing, proppant fracturing, sand control and conformance treatments. In addition, the vessel is equipped to provide well intervention services using coiled tubing. 

Slickline and electric line capabilities can be readily added when required. 

At 200 ft length and 66 ft width, the Stim Star Borneo has an operating draft of 10.5 ft offshore and 9 ft in the delta areas. 

Above deck storage capacities consist of 5,200 gal acid, almost 4,400 gal additives and 350,000 lb proppant. 

Below deck capacities are almost 3,500 bbl of process and completion fluid and over 4,700 bbl of drill water. 

Maximum fracturing rate is 18 bbl/min with sand and 25 bbl/min with clean fluid.

Focused on Safety and Environmental Performance 

The Stim Star Borneo meets or exceeds the requirement of SOLAS and other regulatory bodies. In addition, the vessel is outfitted to provide environmentally sustainable operations. 

Advanced Technologies for Improved Well Performance 

The Stim Star Borneo serves as a platform that enables Halliburton specialists to reliably deliver key services. 

Reservoir Deliverability Solutions 

• Hydraulic fracturing
• Tight gas reservoir technologies
• Horizontal well fracturing
• Limited entry to bypass damage
• Near-wellbore damage removal
• Matrix acidizing
• Foamed acid
• Near-wellbore damage removal (cont’d)
• Scale removal (mechanical and chemical)
• Waterblock removal
• Horizontal well cleanup 

Conformance Solutions 

• Chemical water shut off
• Relative permeability modification 

Sand Control Solutions 

• New completions
• Fracpack
• High rate water pack
• Thru-tubing intervention
• Resin sand consolidation
• Thru-tubing gravel pack with coiled tubing 

Well Intervention Solutions – Coiled Tubing 

• Nitrogen services
• Fishing and milling
• Stimulation
• Sediment washing
• Logging 

InstaVis™ Mixing System 

The Stim Star Borneo is equipped with Halliburton’s proprietary InstaVis™ gel-on-the-fly system that uses a fully hydrated fracturing gel concentrate and provides important advantages: 

• Eliminates waiting for gel hydration.
• Enables almost instantaneous adjustments to help match fluid characteristics to formation parameters.
• Requires no waiting time to build additional fluid volume or change viscosity.
• Enables optimization of gel polymer loading during the treatment which can reduce the amount of polymer in the formation.

關鍵字: 修井船 哈里伯頓 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 m.tolkopozitiv.com Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
主站蜘蛛池模板: 4p高h肉辣古代| 7777奇米影视| 日韩免费在线观看| 亚洲韩精品欧美一区二区三区| 高清一本之道加勒比在线| 在线看欧美成人中文字幕视频| 久久五月天综合网| 欧美巨大bbbb| 免费一级黄色大片| 西西人体www44rt大胆高清| 国产精品特黄一级国产大片| 一级毛片在播放免费| 日韩在线第一区| 亚洲日韩乱码久久久久久| 精品国产综合区久久久久久 | 国产麻豆精品免费密入口| 中文字幕a∨在线乱码免费看| 最近中文字幕在线中文高清版| 亚洲网站免费看| 精品香蕉一区二区三区| 国产国语一级毛片在线视频| 777精品视频| 天天看片天天干| 中文字幕丝袜制服| 日韩一区二区在线视频| 亚洲国产成人精品无码区在线观看| 男女同房猛烈无遮挡动态图 | xxxx日本在线| 日日噜噜夜夜狠狠va视频| 亚洲va中文字幕无码久久| 毛片毛片毛片毛片毛片毛片| 午夜小视频在线| 草莓app在线观看| 国产成人精品免高潮在线观看| 88av免费观看| 天天操夜夜操视频| 东北老妇露脸xxxxx| 日本三级带日本三级带黄首页| 九九免费精品视频在这里| 欧美性黑人极品hd| 亚洲精品国产福利一二区|